Code of Practice for Glass Reinforced Pipe Technique Suiting Indian Condition


Table of Contents

PREFACE

 

The subsurface infrastructure plays a critical role in protecting public health and promoting economic prosperity of the nation. Largely out of right, it remains out of mind and its presence is felt only when failures occur. Less number of failures means better returns on the investment on such infrastructure and only way to insure it, is to standardize the construction process.

Code of Practice for GRP Lining Technique Suiting Indian Conditions has been developed with such objective & it aims at recommending guidelines for a safe GRP Lining construction project. It is developed through the deliberations of the code committee of IndSTT with a view to Indian conditions.

GRP Lining projects, which normally are design & build contracts, have many parameters impacting the project's output. Any unanticipated variation, in any of the parameters, may lead to partial or complete failure of project. Thorough designing & project evaluation, therefore is more than important for a successful project. This document has been prepared with a view to provide the information about important & essential end conditions to the project executioner. Such conditions can never be complete and each project has to be evaluated in totality & the exercise needs to be done by specialists. The design prepared for the project subsequently has to be authenticated by site condition evaluation process & once the characteristics are clearly established, only then the project must be initiated. In addition, the constructor must be prepared for mid-course corrections in case of any malfunction or indication thereof. Failure to do so, naturally, may lead to enhanced difficulties and, at times, to complete project failure. The code aims to reduce such failures & therefore suggests some of the end conditions.

User may also understand that project execution also has to be done by experts only, as in-experienced workers may not be able to identify impending danger & adopt necessary corrective measures in time. It is important that the professionals enaged must be adequately trained & experienced on the specific project work. In addition, it is expected that the code will be a helpful tool in the hands of such professionals. It would be able to assist the new-comers, to understand the nuances of the work, who subsequently can proceed to become processionals through more training & experience.

As with all codes of practices, this would be reviewed and updated with the passage of time and the user/reader is invited to send their comment for further development of the code.

Dr. Niranjan Swarup
Director General
Indian Society for Trenchless Technology


Table of Contents

 

  Section 1: General

1.

Scope

2.

Terminology

   
  Section 2: Material
3.

Glass Reinforced Pipe (GRP) & Fittings

4.

Testing

5. Design Parameters to be Considered by the Contractor
6.

Additional requirements

   
  Section 3: Investigations
7. Preliminary Analysis of Pipeline System
  7.1      General
  7.2      Quality of the existing pipeline
  7.3      Extent of Pipeline Analysis and Evaluation
  7.4      Pipeline rehabilitation method selection
   
  Section 4: Preparatory / Associated Activities & Installation / Construction
8.
Handling and Installation Specification
9.

Tests for GRP Pipes

10.

Dimensions

11. Stiffness
12.

Pressure Test

13. Pipe Laying
14. Pipe Bedding
15. Concrete Protection to Pipes
16. Completion of Pipe Surround
17. Backfilling
18. Gullies and Drainage Channels
19. Manhole
20. Thrust Blocks
   
  Appendix
A

Inspection

 

A.1    Intent and Extent of Survey

  A.2    Initial CCTV Survey and Condition Evaluations of Sewers
 

A.3    CCTV Inspection Prior to Pre-rehabilitation of Sewers

  A.4    CCTV Inspection after Rehabilitation Works
  A.5    Inspection Reporting
  A.6    Extent of Survey I Inspection
  A.7    Time of Inspection
  A.8    Sewer Preparation Prior to Inspection
  A.9    Equipment
  A.10  CCTV Survey - General Technical Specification
  A.11  CCTV Performance Specification
  A.12  Man Entry Survey - General Technical Specification
  A.13  Survey Data Specifications
   
B

Cleaning of Sewers & Other Associated Works

 

B.1    General

  B.2    Equipment
 

B.3    Cleaning and Proper Disposal of Wastes

  B.4    Removal of Intruding Materials
  B.5    Removal of Obstructions
  B.6    Acceptance of Cleaning and Removal of Obstructions
   
C

Sewer Manhole Rehabilitation

 

C.1    General Scope

  C.2    Site Considerations
 

C.3    Safety

  C.4    Photographic Record
  C.5    Manhole Cover/Frame Replacement
  C.6    Manhole Cover Renovation
  C.7    Preparation of Manholes Prior to Manhole Rehabilitation
  C.8    Exposed Reinforcement
  C.9    Treatment of Manhole Benching, Walls and Slabs
  C.10  Treatment of Manhole Bases