With reference to NIB No. NEEPCO/PEN/IND/001, point-wise clarification on the bid queries is detailed below:
Sl. No. | Query | Clarification | ||
1. | “Factor of Safety” specified for the design is 5. Is this factor of safety only for the FRP or for the steel as well? | The Specified Factor of Safety is for FRP only. | ||
2. | For carrying out the lining, we would require sufficient closed storage space for our raw materials. Would this provision be available at the site or should we arrange for the same? | Point No. 28 of Pre- Bid Meeting Queries may be referred. | ||
3. | While carrying out the lining of Penstock- 2, would Penstock- 1 be in operation? If yes, we propose removal of the first ferrule of penstock- 2 as a safety measure to avoid the Penstock from flooding by accident while the works are being carried out. Kindly confirm if this can be done. | Penstock- 1 shall be in operation while carryout the lining works in Penstock- 2. However, there will not be any likelihood of flooding of Penstock- 2. |
||
4. | Kindly let us know, if accommodation shall be available for our engineers, supervisors and technicians at site. | Point No. 24 of Pre- Bid Meeting Queries may be referred. | ||
5. | We note that bidders need to submit an EMD of Rs. 3 Crores along with the bid. Usually in government projects EMD is not applicable for SME Companies. Thus can we take a deviation to the submission of EMD against submission of our SME certificate. | Bid conditions for Micro & Small Enterprises (MSEs) is enclosed at Annexure 1. | ||
Corrigendum XIV |